DATA CENTERS
Bring your own
CAPACITY (BYOC).
Supplement available capacity with FlexEnergi’s Virtual Gas Turbine. VGT helps data centers secure incremental capacity, accelerate interconnection, and lower demand charges.

Incremental
Capacity
Dispatchable megawatts sourced from thousands of VGT-specific battery installations and recruited residential, commercial, industrial, and agricultural sites — capacity you can count on 8,760 hours per year.
Faster
Interconnection
Offset load growth on the utility’s system so new campuses can energize sooner, easing the constraint that holds up queue positions and phased build-outs.
Lower Demand
Charges
Shave coincident peaks against your billing determinants and reduce exposure to capacity and transmission charges — verified with auditable M&V records.
Available Contract Sizes
VGT contracts are available in standard capacity blocks sized to match the addressable behind-the-meter resource base within a utility service territory. Multiple blocks may be stacked.
10 MW
Starter
20 MW
Standard
50 MW
Growth
100 MW
Regional
Deployment Timeline
FlexEnergi operates as a full-service implementation partner. The utility or commercial offtaker signs a single VGT capacity contract. FlexEnergi handles all resource enrollment, hardware, and ongoing operations.
1
Territory Assessment
Weeks 1–2
DER census, addressable load mapping, interconnection point scoping.
2
Contract & Integration
Months 2–4
VGT capacity agreement, SCADA/EMS protocol integration, metering configuration. Utility coordination.
3
DER Enrollment
Months 4–12
Customer registration, controller and battery installations, incentive delivery, fleet commissioning.
4
Commissioning & Testing
Months 12–15
Dispatch testing, grid code compliance verification.
5
Commercial Operation
Month 15
Full capacity in service. Ongoing optimization, fleet growth, and market stacking.
6
Growth
Month 15 onward
As needs grow, so will VGT. Stack additional capacity blocks as load expands — no new contract structure required.
Talk to us about BYOC
Tell us your site, timeline, and interconnection constraint. We’ll size the flexible capacity available in your utility’s territory.